FAR Overhaul Clause CrosswalkAs at 27 Sep 2026 ยท codified, deviation and proposed numbers

FAR 52.227-18 in the FAR overhaul: not carried forward in the deviation text, proposed for removal

FAR 52.227-18 Rights in Data-Existing Works. Not carried forward in the deviation text, as the deviation text and GSA table list it; confidence high. As at 27 Sep 2026.

Codified52.227-18eCFR, clause dated DEC 2007
Under the deviationnot carried forward
Proposed permanent numberproposed for removal

Rem. means not carried forward in the deviation text. "Proposed for removal" in the Proposed column means a proposed rule would remove the clause; nothing proposed is final.

Sources last checked 27 Sep 2026 (dataset version 1). What changed and when. An existing contract's clauses are not rewritten by a later deviation or proposed rule; they change only by modification.

What the source says changed

Proposed rule: Proposed for removal; DFARS-based provisions and clauses at 52.227-24 through 52.227-37 would replace 52.227-14 through 52.227-21 and 52.227-23 as a set (the rule gives no one-to-one mapping).

Why this disposition

RFO model Part 52 shows 52.227-18 [Reserved]; GSA P&C Table disposition "Removed" with no successor named

Confidence: high. Read from an official table or the deviation or rule text itself.

Titles and where each is prescribed

The proposed rule's words: FR 2026-19159 amendatory instruction: "9. Remove and reserve sections 52.227-14 through 52.227-23."

Which agencies

DoD adopted the FAR Part 52 deviation text by class deviation 2026-O0038, effective 1 Feb 2026. GSA's table lists this clause as "Reserved". Confirm which deviation your contracting officer's agency has adopted.

What flows down

Sources, with their dates

Questions

What is FAR 52.227-18 called after the FAR overhaul?

FAR 52.227-18 in the FAR overhaul: not carried forward in the deviation text, proposed for removal. The codified number is 52.227-18; the deviation text lists no number; proposed for removal. As at 27 Sep 2026.

Which number does a contract carry for FAR 52.227-18 after the FAR overhaul?

Which number a given contract carries depends on the deviation the contracting agency has adopted and the date of the solicitation or modification. DoD adopted the FAR Part 52 deviation text effective 1 Feb 2026. Confirm which deviation your contracting officer's agency has adopted.

Is the change to FAR 52.227-18 final?

No final FAR overhaul rule had been published in the Federal Register as at 27 Sep 2026. Proposed for removal.

Read your whole list: run 52.227-18 in the finder, or paste every clause of a contract, flow-down exhibit or template on the landing page. As at 27 Sep 2026.