FAR Overhaul Clause CrosswalkAs at 27 Sep 2026 ยท codified, deviation and proposed numbers

DFARS Part 236 clauses in the FAR overhaul: 13 codified clauses, 0 moved, removed or merged

Every clause the codified DFARS places in DFARS Part 236 (252.236), with the number under the deviation, the proposed number and the disposition. 13 same number in the deviation text. As at 27 Sep 2026.

Codified in this part

13 clauses
CodifiedTitleUnder the deviationProposedDisp.
252.236-7000Modification proposals-price breakdown252.236-7000no DFARS proposed rule in the Federal RegisterKept
252.236-7001Contract drawings and specifications252.236-7001no DFARS proposed rule in the Federal RegisterKept
252.236-7002Obstruction of navigable waterways252.236-7002no DFARS proposed rule in the Federal RegisterKept
252.236-7003Payment for mobilization and preparatory work252.236-7003no DFARS proposed rule in the Federal RegisterKept
252.236-7004Payment for mobilization and demobilization252.236-7004no DFARS proposed rule in the Federal RegisterKept
252.236-7005Airfield safety precautions252.236-7005no DFARS proposed rule in the Federal RegisterKept
252.236-7006Cost limitation252.236-7006no DFARS proposed rule in the Federal RegisterKept
252.236-7007Additive or deductive items252.236-7007no DFARS proposed rule in the Federal RegisterKept
252.236-7008Contract prices-bidding schedules252.236-7008no DFARS proposed rule in the Federal RegisterKept
252.236-7010Overseas military construction-Preference for United States firms252.236-7010no DFARS proposed rule in the Federal RegisterKept
252.236-7011Overseas architect-engineer services-Restriction to United States firms252.236-7011no DFARS proposed rule in the Federal RegisterKept
252.236-7012Military construction on Kwajalein Atoll-evaluation preference252.236-7012no DFARS proposed rule in the Federal RegisterKept
252.236-7013Requirement for Competition Opportunity for American Steel Producers, Fabricators, and Manufacturers252.236-7013no DFARS proposed rule in the Federal RegisterKept

Which number a given contract carries depends on the deviation its awarding agency has adopted and the date of the solicitation or the modification: a contract carries the deviation number only where its agency adopted that deviation and it applies at that date. The finder shows all three numbers and names the source; it does not decide for you. Confirm which deviation your contracting officer's agency has adopted.