FAR Part 36 clauses in the FAR overhaul: 27 codified clauses, 6 moved, removed or merged
Every clause the codified FAR places in FAR Part 36 (52.236), with the number under the deviation, the proposed number and the disposition. 6 not carried forward in the deviation text, 21 same number in the deviation text. As at 27 Sep 2026.
Codified in this part
27 clauses| Codified | Title | Under the deviation | Proposed | Disp. |
|---|---|---|---|---|
| 52.236-1 | Performance of Work by the Contractor | not carried forward | proposed for removal | Rem. |
| 52.236-2 | Differing Site Conditions | 52.236-2 | 52.236-2 | Kept |
| 52.236-3 | Site Investigation and Conditions Affecting the Work | 52.236-3 | 52.236-3 | Kept |
| 52.236-4 | Physical Data | not carried forward | proposed for removal | Rem. |
| 52.236-5 | Material and Workmanship | 52.236-5 | 52.236-5 | Kept |
| 52.236-6 | Superintendence by the Contractor | 52.236-6 | 52.236-6 | Kept |
| 52.236-7 | Permits and Responsibilities | 52.236-7 | 52.236-7 | Kept |
| 52.236-8 | Other Contracts | 52.236-8 | 52.236-8 | Kept |
| 52.236-9 | Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements | 52.236-9 | 52.236-9 | Kept |
| 52.236-10 | Operations and Storage Areas | 52.236-10 | 52.236-10 | Kept |
| 52.236-11 | Use and Possession Prior to Completion | 52.236-11 | 52.236-11 | Kept |
| 52.236-12 | Cleaning Up | 52.236-12 | 52.236-12 | Kept |
| 52.236-13 | Accident Prevention | 52.236-13 | 52.236-13 | Kept |
| 52.236-14 | Availability and Use of Utility Services | 52.236-14 | 52.236-14 | Kept |
| 52.236-15 | Schedules for Construction Contracts | 52.236-15 | 52.236-15 | Kept |
| 52.236-16 | Quantity Surveys | 52.236-16 | 52.236-16 | Kept |
| 52.236-17 | Layout of Work | 52.236-17 | 52.236-17 | Kept |
| 52.236-18 | Work Oversight in Cost-Reimbursement Construction Contracts | 52.236-18 | 52.236-18 | Kept |
| 52.236-19 | Organization and Direction of the Work | not carried forward | proposed for removal | Rem. |
| 52.236-21 | Specifications and Drawings for Construction | 52.236-21 | 52.236-21 | Kept |
| 52.236-22 | Design Within Funding Limitations | 52.236-22 | 52.236-22 | Kept |
| 52.236-23 | Responsibility of the Architect-Engineer Contractor | 52.236-23 | 52.236-23 | Kept |
| 52.236-24 | Work Oversight in Architect-Engineer Contracts | 52.236-24 | 52.236-24 | Kept |
| 52.236-25 | Requirements for Registration of Designers | 52.236-25 | 52.236-25 | Kept |
| 52.236-26 | Preconstruction Conference | not carried forward | proposed for removal | Rem. |
| 52.236-27 | Site Visit (Construction) | not carried forward | proposed for removal | Rem. |
| 52.236-28 | Preparation of Proposals-Construction | not carried forward | proposed for removal | Rem. |
Which number a given contract carries depends on the deviation its awarding agency has adopted and the date of the solicitation or the modification: a contract carries the deviation number only where its agency adopted that deviation and it applies at that date. The finder shows all three numbers and names the source; it does not decide for you. Confirm which deviation your contracting officer's agency has adopted.