FAR Overhaul Clause CrosswalkAs at 27 Sep 2026 ยท codified, deviation and proposed numbers

FAR Part 36 clauses in the FAR overhaul: 27 codified clauses, 6 moved, removed or merged

Every clause the codified FAR places in FAR Part 36 (52.236), with the number under the deviation, the proposed number and the disposition. 6 not carried forward in the deviation text, 21 same number in the deviation text. As at 27 Sep 2026.

Codified in this part

27 clauses
CodifiedTitleUnder the deviationProposedDisp.
52.236-1Performance of Work by the Contractornot carried forwardproposed for removalRem.
52.236-2Differing Site Conditions52.236-252.236-2Kept
52.236-3Site Investigation and Conditions Affecting the Work52.236-352.236-3Kept
52.236-4Physical Datanot carried forwardproposed for removalRem.
52.236-5Material and Workmanship52.236-552.236-5Kept
52.236-6Superintendence by the Contractor52.236-652.236-6Kept
52.236-7Permits and Responsibilities52.236-752.236-7Kept
52.236-8Other Contracts52.236-852.236-8Kept
52.236-9Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements52.236-952.236-9Kept
52.236-10Operations and Storage Areas52.236-1052.236-10Kept
52.236-11Use and Possession Prior to Completion52.236-1152.236-11Kept
52.236-12Cleaning Up52.236-1252.236-12Kept
52.236-13Accident Prevention52.236-1352.236-13Kept
52.236-14Availability and Use of Utility Services52.236-1452.236-14Kept
52.236-15Schedules for Construction Contracts52.236-1552.236-15Kept
52.236-16Quantity Surveys52.236-1652.236-16Kept
52.236-17Layout of Work52.236-1752.236-17Kept
52.236-18Work Oversight in Cost-Reimbursement Construction Contracts52.236-1852.236-18Kept
52.236-19Organization and Direction of the Worknot carried forwardproposed for removalRem.
52.236-21Specifications and Drawings for Construction52.236-2152.236-21Kept
52.236-22Design Within Funding Limitations52.236-2252.236-22Kept
52.236-23Responsibility of the Architect-Engineer Contractor52.236-2352.236-23Kept
52.236-24Work Oversight in Architect-Engineer Contracts52.236-2452.236-24Kept
52.236-25Requirements for Registration of Designers52.236-2552.236-25Kept
52.236-26Preconstruction Conferencenot carried forwardproposed for removalRem.
52.236-27Site Visit (Construction)not carried forwardproposed for removalRem.
52.236-28Preparation of Proposals-Constructionnot carried forwardproposed for removalRem.

Which number a given contract carries depends on the deviation its awarding agency has adopted and the date of the solicitation or the modification: a contract carries the deviation number only where its agency adopted that deviation and it applies at that date. The finder shows all three numbers and names the source; it does not decide for you. Confirm which deviation your contracting officer's agency has adopted.